Cyrus

Cyrus

Watters Contracts were appointed by Kirby Group to deliver the complete busbar installation package at the Cyrus data center in Dublin. The works involved the installation of 300 meters of 4000A busbar systems, forming a critical part of the facility’s power distribution infrastructure.

The project was delivered within a tight schedule and required close coordination with other trades in a live data center environment. Throughout the project, our team maintained strict compliance with health, safety, and quality standards.

Scope of Works

  • Busbar Installation (4000A, 300m total length)

  • Busbar Installation (4000A, 300m total length)